Darmstadt, Germany

Commissioning 2015
Years of Operation 2015-present
Product Capacity Testing Purposes (syngas and byproduct composition)
Utilized Feedstock RDF, Dried Biomass, MSW, Wood, Lignite, Coal (90-130 kg/h)

The facility at the Technical University of Darmstadt is a new state-of-the-art HTW® Pilot Plant. The purpose of the plant is feedstock testing, testing of design parameters, process enhancement, and operator training. The following operational parameters can be tested:
– Syngas, Bottom Ash, and Dust Composition.
– C-Gasification degree, agglomeration limits under real conditions.
– Optimum gasification temperatures.

GIDARA Energy can aid clients in feedstock testing for optimum gasification results. Per week of testing, approx. 25 tons of feedstock is required.

Questions?

Please contact us via the contact details below.

+31(0)158 200 700
(on working days between 08:30 - 17:00)